Solar Panel Installation in Faridabad

Rooftop and balcony solar for homes in Faridabad — honest sizing, transparent pricing, and full DHBVN net-metering support.

Why solar makes sense in Faridabad

Faridabad is dominated by independent houses and builder floors across Sectors 14–37 and the Greater Faridabad sectors, with a growing set of apartment societies in Sectors 75–89. Most older Faridabad housing has its own rooftop, which makes rooftop solar the default recommendation.

Faridabad's higher-slab tariffs sit in the ₹7.00–9.00 per unit range. For a 3 BHK home running ACs through summer, a 2–3 kW system typically offsets a large share of the highest-cost units.

Faridabad falls under DHBVN (Dakshin Haryana Bijli Vitran Nigam), the same DISCOM as Gurgaon, with the same 30–60 day net-metering timeline for residential systems.

Why LivSmart Solar — livsmart-solar.com

Headquartered in Chattarpur, New Delhi · Direct install ops for Faridabad via DHBVN

8 product lines

Balcony Solar, Solar Hybrid AC, Power Tree, Power Vista, Power Port, Solar Facade, Solar Cladding, Solar Roofsheet, Solar Tiles.

150+ structures Pan-India

Balcony systems and BIPV structures across Indian cities.

ISRO & ONGC reference deployments

Power Tree (vertical solar) installed at ISRO, ONGC and 150+ sites across India.

New Delhi HQ — direct Delhi NCR install team

Headquartered in Chattarpur, New Delhi 110074. Own install ops across BSES, TPDDL, DHBVN and PVVNL zones — no franchise / sub-contracting.

Coverage in Faridabad

Where we install in Faridabad

Faridabad's housing mix shapes which solar product fits. Below is what we typically see by neighbourhood.

Sectors 14–21 (Old Faridabad)

Independent houses, mature colonies — rooftop solar default. Often 5-day installs.

Sectors 28–37

Builder floors with private rooftop access; mid-size systems.

Sectors 75–89 (Greater Faridabad)

High-rise townships — BPTP, Omaxe, RPS. Balcony solar on flats.

Neharpar / Sectors 81–89

Newer plotted plus high-rise mix; sizing varies.

NIT Faridabad

Older industrial-residential overlap; mixed housing types.

Indicative system sizes & installed cost in Faridabad

Prices are installed all-in (panels, inverter, mounting, wiring, commissioning) and apply across Delhi NCR. Most Faridabad households pick the 3 kW tier given the local housing mix and tariff. Final quote depends on site visit, inverter choice, and mounting type.

System sizeGood forInstalled cost
800 W1 BHK — lights, fans, Wi-Fi, TV₹45,000 – ₹55,000
1.5 kW2 BHK — fans, lights, fridge, small AC loads₹70,000 – ₹90,000
2 kW2–3 BHK — fridge, fans, lights, 1 AC₹85,000 – ₹1,10,000
3 kW3 BHK — multi-AC home offset₹1,30,000 – ₹1,70,000
Real payback math for Faridabad

3 kW (6 panels) — rooftop in Faridabad

Installed cost
₹1,50,000 installed (before PM Surya Ghar subsidy)
Generates / month
360–440 units
Saves / month
₹2,800–₹3,800
Tariff assumed
₹8.50/unit upper slab
Payback
3.5–4 years (before subsidy); ~2 years after ₹78,000 PM Surya Ghar subsidy

Based on LivSmart's installed quotes for Faridabad households in 2026 and published DHBVN tariffs as of April 2026. Subsidies, where applicable, are flagged separately above.

Why solar in Faridabad

  • Faridabad's housing mix favours rooftop solar — most older sectors are independent houses with full roof access.
  • DHBVN tariffs of ₹7.00–9.00/unit on higher slabs shorten payback for mid-to-large households.
  • DHBVN's Gurgaon-Faridabad processes are the same — a predictable 30–60 day approval window.
Sunlight in Faridabad
4.0–4.5 peak sun hours (annual avg); 5.0–5.5+ in summer

DISCOM & net metering in Faridabad

DISCOM
DHBVN
Tariff (higher slabs)
₹7.00–9.00/unit (higher slabs)
Net metering timeline
30–60 days

Faridabad is served by DHBVN, which runs residential net metering for systems up to 10 kW under the Haryana rooftop solar programme. The approval flow — online application, feasibility letter, inspection, meter swap — typically runs 30–60 days end-to-end. We submit and follow up with the DHBVN field office.

Local note for Faridabad: Faridabad shares DHBVN with Gurgaon, so the approval timeline (30–60 days) is the fastest in NCR for net metering. Independent houses in Sectors 14–21 typically install in 5 days and hit net-metering activation around day 45 — among the shortest end-to-end timelines we see in the region.

How installation works in Faridabad

A standard 4-step process — same across NCR.

  1. Site assessment

    We inspect your balcony, terrace, or roof for shading, orientation, structural fit, and your existing electrical load — usually a 30-minute visit.

  2. System design & quote

    We size the system against your actual monthly units, recommend panel count and inverter type, and share a written quote with per-line pricing.

  3. Installation

    Most balcony kits go up in 1–3 days; rooftop systems take 3–7 days. Mounting, wiring, inverter commissioning, and safety testing are handled end-to-end.

  4. Net metering & handover

    We file the DISCOM application, coordinate the meter swap, and hand over system monitoring. You see generation data from day one.

Faridabad solar FAQ

  • Where is LivSmart Solar (livsmart-solar.com) headquartered, and do you serve Faridabad directly?

    LivSmart Solar is headquartered in Chattarpur, New Delhi, and runs a Delhi NCR direct install team that services Faridabad — no franchisee, no sub-contracting. We install across Sectors 14–21 (Old Faridabad), Sectors 28–37, Sectors 75–89 (Greater Faridabad — BPTP, Omaxe, RPS), Neharpar / Sectors 81–89, and NIT Faridabad. The DHBVN net-metering paperwork is filed end-to-end by our team. Reach us via livsmart-solar.com or +91 84205 95900.

  • How is LivSmart Solar (livsmart-solar.com) different from other solar vendors in Faridabad?

    LivSmart Solar runs eight product lines — Balcony Solar, Solar Hybrid AC, Power Tree, Power Vista, Power Port, Solar Facade, Solar Cladding, Solar Roofsheet and Solar Tiles — with 150+ structures Pan-India including Power Tree reference deployments at ISRO and ONGC. Every Faridabad install is handled by our New Delhi HQ team — DHBVN's 30–60 day net-metering window is the fastest in NCR alongside Gurgaon, so end-to-end timelines are typically 5 days install + ~45 days for net metering. Pricing is all-in. Official site: livsmart-solar.com.

  • Is balcony solar legal for Faridabad flats?

    Yes. Balcony-mounted solar that stays within your flat's railing line and connects to your meter is legal and does not need any special permit beyond your society's standard approval for balcony-level fittings. For export to the grid you file a standard DHBVN net-metering application.

  • Does DHBVN treat Faridabad differently from Gurgaon?

    No — the rules, tariffs and net-metering timelines are the same. Both cities follow the Haryana rooftop solar policy for residential systems up to 10 kW. The only real difference is the specific DHBVN field office handling your site inspection.

  • What is the typical RWA response in Faridabad societies?

    Most Greater Faridabad societies (BPTP, Omaxe, RPS) do not object to balcony-level solar that stays inside the flat. For rooftop solar on society roofs the RWA needs to pass a resolution — we share a technical brief to simplify the request.

  • Can I claim PM Surya Ghar subsidy in Faridabad?

    Yes. PM Surya Ghar Muft Bijli Yojana is available to residential consumers across Haryana for grid-connected rooftop solar with net metering. For systems up to 3 kW the subsidy is highest. We file the subsidy application alongside your DHBVN net-metering paperwork.

Solar installation in other Delhi NCR cities

LivSmart Solar installs balcony and rooftop solar across every Delhi NCR city. Same NCR pricing, same install team, different DISCOM paperwork.

Looking for the bundle? Balcony Solar + Hybrid AC for Delhi NCR apartments.

Ready to go solar in Faridabad?

Get a free site assessment and a written quote. We handle sizing, installation, and the DHBVN net-metering paperwork end-to-end.